# Tracking work logged on tickets

**URL:** https://forum.library.adaptavist.com/t/tracking-work-logged-on-tickets/368
**Category:** ScriptRunner
**Tags:** jira, data-center
**Created:** [August 24, 2023, 10:55pm UTC](https://forum.library.adaptavist.com/t/tracking-work-logged-on-tickets/368 "2023-08-24T22:55:57Z")
**Posts on this page:** 1
**Page:** 1

<div class="post-metadata">

### Author: ![ScottCurwood](https://avatars.discourse-cdn.com/v4/letter/s/ecc23a/32.png) [@ScottCurwood](https://forum.library.adaptavist.com/u/ScottCurwood)
#### Post date: [August 24, 2023, 10:55pm UTC](https://forum.library.adaptavist.com/t/tracking-work-logged-on-tickets/368/1 "2023-08-24T22:55:57Z")

</div>

We are EXTREMELY novices with ScriptRunner and I’m looking for a way to pull in the work logged on Jira tickets by a group of asignee’s over a set period of time. We run Sprints but they don’t display work logged only work estimated and left. Does anyone have a script already doing something similar?
